During the automatic generation of CDI and CSR ISO19139 using MIKADO 3, I have a « datetype » error.

In CDI ISO19139 and CSR ISO19139, the following dates must be extracted from the database as a Date (YYYY-MM-DD) and not as a Date Time (YYYY-MM-DDThh:mm):

  • CDI: Revision date (var06), Cruise date (var17), Station date (var20), Quality procedure date (var96)
  • CSR: Revision date (var04)